MY543
- MaharashtraBhiwandi
-
Kapil Moreshwar Patil
Age: 57 Education: Graduate
- 01 Number of Terms
- 91% 80% Attendance/ National Average
- 52 65.3 Debate Participated/ National Average
- 0 2.2 Private member Bills Introduced/ National Average
- 454 285 Question Asked/ National Average
Source: PRS Legislative Research. Data for full-term ministers not recorded.
Subject-wise LS Questions by the MP
Explanation of graph
- Classification of questions only a broad indication.
- “Miscellaneous” signals that fewer MPs raised these topics in general
MPLADS Expenditure
Explanation of graph
- Source: mplads.gov.in. All figures as of 25 Jan 2019
- State Avg is average expenditure of all state constituencies
- Entitlement > 25 crores (carry over from previous LS term)
- Entitlement < 25 crores (by-election/seat vacant)
- Entitlement = 0 (no data available)
Constituency Indicators
Explanation of graph
- The constituency level estimates for nutrition, health, and development are based on research conducted by population health scientists and social scientists at Harvard, IEG, and the Tata Trusts. The complete data, in addition to map visualizations, are available at https://www.hsph.harvard.edu/population-development/indiapcfactsheets
All work only election time any word not a start in 2014.bhiwandi city under not a educational development .no helth care only pollution in roads breadje wir in Stop in 4 to 3 month and any work not a complete in 5years Bhiwandi big problem is torrent and Torrent contract renewal why or note solve this problem an then the renewad the contract Bhiwandi’s any problems not a solve in 5 years.
he worked too well.
all damber road is becoming rcc road
once roads work will traffic problm will be resolve automatically..
in entire bhiwandi street light has been replaced by LED light…
cleanliness in bhiwndi nowadays good bmc working well
shortage of water is also short out
before some of the year police mans are also on petroling earlier it was not done by Congress
and he did many good works…
Vier p
Durgadi and Patri pool work pending for long time due to which there are traffic jams all day long.
Road and traffic horrible…. ….Road with pothole…….difficulty in driving….no signals. … no zebra crossings…no manners..difficulty for crossing road or walking….footpath made for…not walking …for shops…..lack of bridge………want goo bridge connecting east west
Patree poll… bridge widder to connect.
Even durgadi poll work STOP……kalyan naka bridge work is stop……..mp in 5 yr not doen any work….
Kalyan needs a flyover connecting Ulhasnagar flyover with durgadi pool and patripool second Kalyan needs extra bus stand to reduce the load on the existing one building new bus stand at adharwadi and another at Metro Mall can solve traffic jam please pay attention
1. The entry point of Kalyan West ie the Durgadi Bridge has been completely neglected as the work has started long before but still not completed and dont see any progress.
2. It has been months that the bridge connecting Kalyan East & Kalyan West which was demolished but still cant see any progress of the new bridge which causes tremendous hardship to thousands of daily commuter who use this road.
3.Sky Walk connecting Kalyan (W) railway station & the main road condition is so bad with dirt & hawkers that it is difficult to walk & use them. I dont know how & why this sky walk becomes a hawkers zone and why no action is been taken to remove them. It is done right under the nose of the police station.
I hope the authority are awakes NOW
कपिल साहेब,
भिवंडी में पुलिस वालो की बहुत परेशानी है गाड़ी वालो के पास से रुपया ५०० ले के पावती २००रुपए की देते है।
खुले आम पुलिस वाले रिश्वत लेते है इनको कोई रोकने वाला नहीं कृपया करके आम जनता की परेशानियों को दूर करने जरूर है
Bhiwandi, poor to pathetic roads everywhere. Only patch work done, no proper/full road construction done. No control over traffic / traffic rules, street hawkers and illegal parking is the biggest issue of Bhiwandi. This man has done nothing on these issues.
भिवंडी मे बहुत प्रदूषण है सडक बहुत खराब है गदगी है आज तक कुछ काम हुवा नही है
Kalyan Road Cement Road and bridge Construction is very-very slow. 2-3 people lost their live also. In other parts of the bhiwandi 2 lane cement road constructed (Anjurphata to dhamankarnaka), but in kalyan road only 1 Lane cement road constructed and in second lance they are constructing bricks road (it seems on more corruption).
In short, lots of announcement but no work on ground.
How long people will vote in the name of Modi. what about MP’s performance?
I cant undestand how can be start two works at one time, 1)fly ower brige work. 2) road repairing work also start. Thats why so much trafic and pilotin and road services to bad. Plz think and do fast work in bhiwandi flyower and road repairing works.
Your faithfull
Kalyan west station area problem to solve
hawkers, traffic, signal, unauthorised parking,, kdmt losses and proper service, proper bridges all around kalyan west , proper roads, dumping ground issues,kdmc hospitals to improve
Neglected Badlapur completely, Badlapur population doubled in last 10 years, every household gets just 1/2 an hour of municipal water, if entire built up flats gets occupied then water crises will be worst…no solution(s) initiated by MP. No signs of 3rd & 4th track in Kalyan-Karjat section for suburban railway, no visible steps taken by MP. Load-Shedding still present, although electricity per unit charges are highest in state. Current MP of the constituency is below average.
Not paid much attention to Badlapur the most crowdiest railway station falling in his constituency. Nothing concrete has been done for laying additional railway tracks on Kalyan-Badlapur route.
Issues in Kalyan West Area:-
1. Kalyan West near Durgadi Dumping is a really issue and CM promised to resolve the same in phaseout manner. Nothing happened till now. What’s the timeline? People in the area are living in hell.
2. Kalyan is pollution. Any plan to redress this?
3. Traffic on Agra Road is really terrible
4. Hawkers on Agra Road
Please do ASAP.
Traffic problem has aggrevated since last 3.5-4 years. Road development plans need to be executed with proper planning and also very Swifty. This is lagging currently. Pollution is also a sever problem in Bhiwandi which needs to be paid attention to. Playgrounds and parks need to be developed as these are necessary for children.
Flyover problem needs to be solved
Traffic problems is severe. Bridges of Patri pool and durgadi no attention. Very horrible traffic situations. Solid waste disposal problems not looked.
Nice work and displine leader attention need for loom and textile industry and attention and arrangements for traffic jam Agra Thane road and fly over should be to prevent jams
Durgadi Bridge should have been completed and traffic issues at kon gaon should have been sorted
Smart city work – none
Good work done. Always ready to help. Man of masses. Traffic problems still persist. Need attention
What good work? Ready to help whom?
Please elaborate. Thanks.