New Delhi: At least two people were killed and several feared trapped after a three-storey under-construction building collapsed in Old Delhi’s Chawri Bazar Thursday morning.
The incident took place amid the Diwali rush, in the narrow bylanes of Chawri Bazar, which sees an increased footfall during the festive season. The Municipal Corporation of Delhi (MCD) has suspended a junior engineer and an assistant engineer.
The police said the incident was reported at 9.50 am from Gali Sitara, near the Chawri Bazar Metro station. At least six fire units, including water tenders and rescue vehicles, were rushed to the scene.
DCP Central Rohit Rajbir Singh said a building was being constructed and work was underway on the third floor.
“During the pouring of the (concrete for) the slab, the building collapsed. The building has caved in significantly, and people in the surrounding buildings have been evacuated. The building next to the collapsed one is also in a precarious condition,” DCP said.

Of the four people pulled out of the rubble by the NDRF, two were declared dead at the hospital; two are stable and out of danger. Rescue operations are continuing.
The police said they have identified the builders and are looking for them.
“Unauthorised construction was going on here, and a letter had already been sent by us to the municipal agencies. We were following up on it, but the work had not been stopped. 10-15 labourers were present at the time of the incident. There is a possibility that there were more workers…” the DCP said.

Meanwhile, Delhi Chief Minister Rekha Gupta ordered the immediate suspension of the junior engineer and assistant engineer, and a thorough probe into the incident. She also ordered the registration of an FIR against the contractor. She has also announced immediate ex-gratia assistance to the affected families.
Wholesale markets such as Chandni Chowk, Chawri Bazar and Lajpat Nagar see massive crowds during this time of the year.
(Edited by Viny Mishra)
Also read: Collapsed building in Satya Niketan housed 75-bed PG; ‘ground floor was under repair’
