The pace of development is very fast so perhaps the quality and quantity of the material, our expertise, our capacity, is not matching what is required, says Manoranjan Parida, President of Indian Road Congress.
In tactical terms, the shirtless protest was worse than a self-goal. Suddenly, the fiascos of the AI Summit were forgotten, and the Youth Congress’s disruption became the issue.
IAF is fine with accepting the aircraft with 'must-haves', even if some other steps remain pending, which may take at least another year, it is learnt.
This is nonsense. The pace of so-called development is fast is more reason to have achieved perfection in infrastructure building and not what this low rate article says in the veru beginning.
“ From Bihar to Gujarat to Maharashtra, bridges are collapsing all over the country like they were made of Lego”. The comparison with Lego is incorrect. As someone who has been assembling Lego sets for 40 years, I can confidently state that Lego sets are extremely well-designed and can remain together for years, even decades, after assembly. They are often a marvel of engineering and sound design. Maybe our engineers can learn from Lego designers.
Thank you for this article. I live in Palava and have been suffering . Couple of other flyovers near Palava too have developed huge potholes within few months of inauguration.I also recently undertook a trip to Kanyakumari via NH66 and saw the pathetic condition of the roads.
This is nonsense. The pace of so-called development is fast is more reason to have achieved perfection in infrastructure building and not what this low rate article says in the veru beginning.
“ From Bihar to Gujarat to Maharashtra, bridges are collapsing all over the country like they were made of Lego”. The comparison with Lego is incorrect. As someone who has been assembling Lego sets for 40 years, I can confidently state that Lego sets are extremely well-designed and can remain together for years, even decades, after assembly. They are often a marvel of engineering and sound design. Maybe our engineers can learn from Lego designers.
Thank you for this article. I live in Palava and have been suffering . Couple of other flyovers near Palava too have developed huge potholes within few months of inauguration.I also recently undertook a trip to Kanyakumari via NH66 and saw the pathetic condition of the roads.