scorecardresearch
Monday, October 7, 2024
Support Our Journalism
HomeIndiaMumbai's 1st underground Metro stretch from BKC to Aarey opens for public

Mumbai’s 1st underground Metro stretch from BKC to Aarey opens for public

Follow Us :
Text Size:

Mumbai, Oct 7 (PTI) Mumbai’s first underground Metro corridor, the aqua line’s phase-1, stretching from Bandra-Kurla Complex (BKC) to Aarey became operational for the public on Monday morning.

A large number of people came to experience the ride on the first day of the BKC to Aarey stretch of Mumbai Metro Line 3.

The Metro operation on the stretch commenced for the public at 11 am, amid cheers from passengers.

Prime Minister Narendra Modi on Saturday inaugurated the 12.69 km long phase-1 of the BKC to Aarey stretch of Mumbai Metro Line 3.

He travelled from BKC to Santacruz and back during which he interacted with students, beneficiaries of the Maharashtra government’s Ladki Bahin scheme and labourers involved in constructing the underground line.

The Mumbai Metro Rail Corporation (MMRC), which is executing the 33.5-km-long Colaba-SEEPZ-Aarey JVLR project, has already notified that the regular operation of the Metro on the aqua line will commence from Tuesday.

As per the notification, services will be operated from 6.30 am to 10.30 pm between Monday and Saturday, and from 8.30 am to 10.30 pm on Sundays.

The minimum fare for a ride on the Metro line is Rs 10 and maximum Rs 50, as per the MMRC.

Passengers can book tickets using the NCMC (National Common Mobility Card), Mumbai Metro 3 mobile app, and ticket vending machines, among other means.

The corridor between BKC and Aarey road has 10 Metro stations – BKC, Bandra Colony, Santacruz metro, Chhatrapati Shivaji Maharaj International Airport (CSMIA) T1, Sahar Road, CSMIA T 2, Marol Naka, Andheri, SEEPZ, Aarey Colony JVLR. Of these, only Aarey JVLR station is at a grade while all others are underground.

The aqua line is the fourth Metro corridor of Mumbai.

The Ghatkopar-Andheri-Versova Metro Line-1, Andheri West-Dahisar Line-2A and Andheri East-Dahisar Line-7 are already operational in the city. PTI KK GK

This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.

Subscribe to our channels on YouTube, Telegram & WhatsApp

Support Our Journalism

India needs fair, non-hyphenated and questioning journalism, packed with on-ground reporting. ThePrint – with exceptional reporters, columnists and editors – is doing just that.

Sustaining this needs support from wonderful readers like you.

Whether you live in India or overseas, you can take a paid subscription by clicking here.

Support Our Journalism

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular